CONSTRUCTION SITE PREFABRICATED STRUCTURES TECHNICAL SPECIFICATIONS
TECHNICAL DATA: Production is based on 80 kg/m² snow mass, wind velocity of 80 km/hour, 1st degree earthquake conditions and 3rd climatic region conditions.
1- EXTERNAL AND INTERNAL WALL PANELS
- The walls’ external and internal sides are cement plates of 8x1250x2500 mm dimensions.
- The wall panels will be pressed panel.
- 12-14 density, 44 mm thick polystyrene foam will be used for insulation.
- Insulation coefficient factor is K: 0,64 kcal/m² hc.
2- WALL COMPOUND
- The compound units are made of specially made U and H DKP steel sheet materials plied and connected with a special connection system. In case of radial occurrence on the steel sheets, there will be no rusting as a result of transpiration.
3- WINDOWS
- The Windows are made of 60mm thick white PVC and are 1190*1000 mm. in size
- The transomwindows are 400*600 mm. in size.
- The glass is thermal insulation glass.
4- DOORS
- External doors are 900*2000 mm in size, American style doors.
- Internal doors are 80*2000 mm in size, plain style non-ribbed doors.
5- LOAD BEARING STRUCTURE
- The roof brackets are made of box profile and specially made DKP steel sheet profile. There is a steel shear at every 125cm all around the building.
- Steel shears exists. The columns are constructed of specially made DKP steel profiles.
- The purlins are 5*5 cm. in size and made of wood.
- The connections are fastened with nuts and bolts that may be fastened and unfastened multiple times.
6- CEILING COVERING AND INSULATION
- The ceilings are covered with 12 mm thick gypsum plates.
- The ceiling is insulated with 80 mm thick fiberglass.
- The ceiling connection is made by plying and then crushing the DKP steel sheet that has been forged under the roof brackets.
- In case of radial occurrence on the steel sheets, there will be no rusting as a result of transpiration.
- The gypsum connection units are made of electro-static painted aluminum material.
- The ceiling heat insulation coefficient factor is K:0,49 kcal/m² hc.
7- CEILING COVER
- Plastic gasket nails are used to fasten the onduline over the wooden purlins.
- The building will surrounded with a 20 cm wide plied DKP steel plate overhang.
- The ceiling will have an earthquake diagonal rod made of profiles.
- PVC rainwater leaders and gutters will be put in place.
8- PAINT
- The external metal surfaces are painted with double body coat and double synthetic oil paint.
- The external betopan wall is covered with acrylic external paint.
- The internal walls and ceiling are coated with plastic paint.
- The external wall joints are coated with mastic.
- All paints used have TSE certificate.
9 - ELECTRICAL INSTALLATION
- The complete installation is TSE certified and will be placed under the plaster.
- All switches and plugs are already mounted.
- Electrical panel and counter are not included.
10 - SANITARY INSTALLATION
- Potable water plumbing is made of PVC based and TSE certified white piping placed under the plaster.
- The faucets and armature fittings are TSE certified and will be handed over without assembly.
- Water counter is not included.
MTN Steel Prefabricated Structures reserves the right to make changes as fit regarding technical matters. |