| QUESTION - ANSWER Question:  Is a  building permit necessary for construction of the buildings?Answer:  Building permits are within the jurisdictions of municipalities and you need to  seek their council in order to carry out construction.
 Question:  Does your company attain the permit?Answer:   Attaining the permit and other legal permissions are the customer’s  responsibility.  The customer is responsible  for providing the architectural, electrical, mechanical projects and the soil survey  in order to attain a building permit.   Our company provides static computations for a fee.
 Question:  Is assembly possible every where throughout Turkey? Answer:  Yes,  we are able to provide assembly throughout Turkey.
 Question:  Will there be additional costs if the  assembly is out of town?Answer:  For  out of Istanbul  assembly jobs, the meal and accommodation costs of the assembly crew are the  responsibility of the customer.
 Question:  What is included in the price?Answer:  The  manufacture, assembly, electrical installation, plumbing installation, internal  and external painting, doors, windows, glasses, bath fixtures, faucets, plugs  and switches of the buildings are included in the price.
 Question:  What are the responsibilities of the  customer? Answer:  The  foundation cement, all sorts of excavations and landscape projects are within  the customer’s responsibilities.  Floor  and wall coverings (aluminum, ceramic, tile, carpeting, etc.), the necessary  connections external to the prefabricated building (electricity, sewer, potable  water), all sorts of permits and permissions to be attained from the  municipalities, heating and cooling systems (heater, air-conditioning, etc.)  are all the responsibility of the customer.   Housing and accommodations for workers for job sites out of Istanbul, as well as the  transportation and insurance of materials are the responsibility of the  customer.
   Question:  How is the heat insulation of the buildings?Answer:  The  walls and roofs of our buildings are heat insulated.  It is warm in the winter and cool in the  summer.  The insulation is adjusted to  meet the climatic conditions of the construction site.
 Question:  What is the wall thickness?Answer:   Standard wall thickness is 60   m and can be changed to customer’s specifications and  climatic conditions.
 Question:  What is the term of completion?Answer:  A  single story building takes approximately 10-20 days for production, assembly  and completion.  Mounting the building  takes six days after completion of the cement foundation.
 Question:  What is the method of payment?Answer:  40%  cash upfront at time of agreement and remainder in two installments of 30 and  60 day term check.  Alternative methods  of payment may be discussed in person.
 Question:  What  is the maximum number of floors and square meters that can be constructed?Answer:  Our projects and pricing are figured on a two  story project, the construction can be made for the requested number of square  meters and floors with the necessary static computations. However; increasing  the number of floors and square meters increases costs.
 Question:  What is the lifespan of the buildings?Answer:  Our  buildings’ lifespan is the same as that of ferro-concrete buildings, being  between 30-50 years.  It is possible to  extend the lifespan of buildings by applying covering over the external  surfaces.
 Question:  Do the buildings come with a guarantee?Answer:  Our buildings come with a 5 year  manufacturer’s guarantee against manufacturing and assembly errors.
 Question:   Is the requested project applicable?Answer:  Along with being able to  make modifications on sample projects, we are able to apply our standards to  the project of your choice.
 |